Some VoltEdge links are affiliate links that may earn a commission, at no extra cost to you. The cost figures below are quoted from public sources and do not depend on any link. See the affiliate disclosure.

The short answer: There is no published statewide Level 2 installation price for Massachusetts on this page. In the 2022 Idaho National Laboratory sample of Smart Charge America residential jobs, installation, with the charger itself not included, had a median of $1,098 and a mean of $1,310, from about $150 to about $18,000. Massachusetts's May 2025 mean electrician wage is $39.21 an hour, index 1.14 versus the U.S. mean of $34.37, about 14% above the U.S. mean. That index is not a quote.

National installation sample, labeled by scope

Use these figures as the national picture. They are not a bid for Massachusetts. Distance, permit examples, the service-upgrade sample, and the multifamily sample are on the hub methodology.

Charger hardware is a separate price from installation. Idaho National Laboratory report INL/RPT-22-68598 (Schey, Chu, and Smart, August 2022) checked Amazon.com and found 30 basic residential Level 2 wall-mount units from $335 to $899, with a median of $549, and a median of $575 for 22 smart units. That report quotes Rocky Mountain Institute at $380 to $689. The AFDC infrastructure page, reviewed on 2026-10-25, quotes the RMI range as $380 to $690. Both wordings are cited. This page does not pick one.

Sources: Schey, Chu, and Smart, Breakdown of Electric Vehicle Supply Equipment Installation Costs, INL/RPT-22-68598, August 2022; OSTI PDF of INL/RPT-22-68598; AFDC, Procurement and Installation for Electric Vehicle Charging Infrastructure.

The same INL report uses Smart Charge America billing records: more than 4,800 residential records, primarily from July 2018 to May 2022, from contractors in 20 major metros and from outside those metros. Installation cost, analyzed separately from the charger price, ran from about $150 to about $18,000. The mean was $1,310 and the median was $1,098. 45% of those installation costs were under $800. The report defines that installation cost as labor, materials such as wiring and conduit, permit fees, travel, and added fees such as design and overhead. Do not add labor again on top of $1,310.

Sources: Schey, Chu, and Smart, INL/RPT-22-68598, August 2022.

AFDC's infrastructure page says residential Level 2 installation is approximately $1,300 per connector and says that figure does not include labor and permitting. It cites the National Laboratory of the Rockies and Idaho National Laboratory levelized-cost report. That is a different citation, and a different scope, from the $1,310 mean above, which already includes labor and permits. Do not stack the two figures.

Sources: AFDC, Procurement and Installation for Electric Vehicle Charging Infrastructure.

The federal Alternative Fuel Vehicle Refueling Property Credit, 26 U.S.C. 30C, expired for property placed in service after June 30, 2026. AFDC lists that expiration date. For a charger at a principal residence in a qualified location from January 1, 2023, through June 30, 2026, the credit was 30% of the cost, up to $1,000. A new installation does not qualify. In that same window, the business credit was 6% of depreciable costs, or 30% if prevailing-wage and apprenticeship rules were met, up to $100,000 per item. That business credit is also closed for property placed in service after June 30, 2026.

Sources: AFDC law 10513, Alternative Fuel Infrastructure Tax Credit; IRS, Instructions for Form 8911.

Electrician wages in Massachusetts

Massachusetts electricians (SOC 47-2111, all industries) had a mean hourly wage of $39.21 and a mean annual wage of $81,560 in the May 2025 OEWS release. Employment was 17,810. The median hourly wage was $38.18. The U.S. mean was $34.37 an hour and $71,490 a year, with employment of 757,220. The state mean divided by the U.S. mean is 1.14, about 14% above the U.S. mean. That is the 10th-highest mean hourly wage among the 50 states and the District of Columbia.

The index is 1.14: the state mean hourly wage divided by the U.S. mean of $34.37, rounded to two decimals. About 14% above the U.S. mean. OEWS covers wage-and-salary workers and excludes the self-employed. A contractor's bill rate is not this wage. The 2022 installation report's average electrician time is on the hub. This page does not multiply that time by $39.21.

Source: Massachusetts electricians, May 2025 OEWS and the national electricians table. Workbooks: oesm25st.zip and oesm25nat.zip.

Programs AFDC lists for Massachusetts

Amounts below are copied from the AFDC record. If a program is for workplaces, public sites, or multifamily buildings, the label says so. Funding can be exhausted before the law page comes down. Check the program site before you apply.

Multifamily and campus programs

Multi-Family Housing (MFH) and Educational Campus Electric Vehicle (EV) Charger Grants

Massachusetts multifamily housing and educational campuses. Not a single-family garage rebate.

The Massachusetts Electric Vehicle Incentive Program (MassEVIP) provides grants for 60% of the cost of Level 1 or Level 2 EV chargers installed at MFHs and educational campuses, up to $50,000 per street address.

AFDC law 12160 · Program site

Public, workplace, fleet, or commercial programs

Workplace and Fleet Electric Vehicle (EV) Charger Grants

Massachusetts workplaces and fleets. Not a home rebate.

The Massachusetts Electric Vehicle Incentive Program (MassEVIP) provides grants for 60% of the cost of Level 1 or Level 2 EV chargers, up to $50,000 per street address. Eligible entities include workplaces and fleets with 15 or more employees on site.

AFDC law 11562 · Program site

Public Access Electric Vehicle (EV) Charger Grants

Massachusetts public-access chargers. Not a home rebate.

The Public Access Charging Program provides grants to non-residential entities for 80% of the cost of Level 2 EV chargers and installation, and a maximum of $50,000 per street address for hardware and installation costs. Installations at government property qualify for 100% of the cost, up to $50,000. Qualified EV chargers must be available to the public at least 12 hours per day.

AFDC law 12159 · Program site

Programs with no dollar cap in the AFDC record

Electric Vehicle (EV) Charger Rebate

AFDC lists this program. The record reviewed on 2026-10-25 does not state a dollar cap.

Residential customers of participating Massachusetts municipal light plants (MLPs) may be eligible for a free or discounted Level 2 EV charger through the Massachusetts NextZero program.

AFDC law 12021 · Program site

Utility offers AFDC lists

AFDC assigns each utility record below to Massachusetts. Confirm the utility serves the address before you count on an offer. A few utility names show up under more than one state in AFDC. Each bullet is quoted from that record's Residential Incentives / Infrastructure section and names a Level 2 charger, wiring, panel, or make-ready offer. Direct-current fast-charging-only bullets are left out. A record that says no incentives are currently offered is left out. A dollar amount appears only when the bullet states it. This page does not add one.

Belmont Light - Massachusetts

AFDC record 14135 · Utility page linked by AFDC

Braintree Electric Light Department (BELD) - Massachusetts

AFDC record 13585 · Utility page linked by AFDC

Concord Municipal Light - Massachusetts

AFDC record 14139 · Utility page linked by AFDC

Danvers Electric - Massachusetts

AFDC record 14140 · Utility page linked by AFDC

Eversource - Massachusetts

AFDC record 13623 · Utility page linked by AFDC

Hudson Light and Power - Massachusetts

AFDC record 14144 · Utility page linked by AFDC

Mansfield Municipal Electric - Massachusetts

AFDC record 14131 · Utility page linked by AFDC

Marblehead Electric CO - Massachusetts

AFDC record 14146 · Utility page linked by AFDC

National Grid - Massachusetts

AFDC record 13643 · Utility page linked by AFDC

North Attleborough Electric Department - Massachusetts

AFDC record 14134 · Utility page linked by AFDC

Reading Municipal Light Department - Massachusetts

AFDC record 14136 · Utility page linked by AFDC

Shrewsbury Electric and Cable Operations (SELCO) - Massachusetts

AFDC record 13813 · Utility page linked by AFDC

Taunton Municipal Light Plant - Massachusetts

AFDC record 14137 · Utility page linked by AFDC

Wakefield Municipal Gas & Light - Massachusetts

AFDC record 14138 · Utility page linked by AFDC

Look up the utility for an address in the AFDC U-Finder.

Building, access, and permitting rules

These are access, building, or permitting rules, not rebates. A dollar amount or a percent in this list is a project-size trigger or a share of parking spaces.

What to do with these numbers

Ask for an itemized written quote: charger, circuit, panel or service work, utility fees, trenching, permits, and exclusions. The panel question is separate. The panel guide does not publish an upgrade price. What it costs to charge after the hardware is in is on the Massachusetts charging-cost page.

See whether a panel can take a Level 2 circuit

See what charging costs in Massachusetts

See home charger rebates in Massachusetts

See the extra EV registration fee in Massachusetts

Also in New England

All 50 states and the District of Columbia

Home hardware, if you are pricing a Level 2 charger. The ChargePoint Home Flex is the adjustable 16–50A unit covered in the charger guide and the Home Flex review. The hardware ranges higher on this page come from the cited DOE report, not from this link. The button opens the Amazon listing.

Check Home Flex on Amazon

Shopping for a Tesla? The referral link is ts.la/tyler468767.

FAQ: installing a Level 2 charger in Massachusetts

How much does it cost to install a Level 2 EV charger in Massachusetts?

There is no published statewide Level 2 installation price for Massachusetts on this page. In the 2022 Idaho National Laboratory sample of Smart Charge America residential jobs, installation, with the charger itself not included, had a median of $1,098 and a mean of $1,310, from about $150 to about $18,000. Massachusetts's May 2025 mean electrician wage is $39.21 an hour, index 1.14 versus the U.S. mean of $34.37, about 14% above the U.S. mean. That index is not a quote.

Does Massachusetts have a Level 2 charger rebate?

The AFDC records reviewed on 2026-10-25 do not state a resident or make-ready dollar cap for Massachusetts. Public or utility programs may still exist. This page lists the ones in that extract and does not invent a rebate amount.

Can a new home Level 2 installation still claim the federal 30C credit?

The federal Alternative Fuel Vehicle Refueling Property Credit, 26 U.S.C. 30C, expired for property placed in service after June 30, 2026. AFDC lists that expiration date. For a charger at a principal residence in a qualified location from January 1, 2023, through June 30, 2026, the credit was 30% of the cost, up to $1,000. A new installation does not qualify. In that same window, the business credit was 6% of depreciable costs, or 30% if prevailing-wage and apprenticeship rules were met, up to $100,000 per item. That business credit is also closed for property placed in service after June 30, 2026.

Sources